Network cable run, wall port installation, cable termination and testing at Hula medical building
Project Description:
Licensed Contractor to install new wall boxes with smurf tube within wall cavities, run network cable from IT closet to network receptacles, terminate and test network cable runs.
- All cable to be “Yellow Riser Standard Cat6” and J hook as necessary.
- All plastic wall plates should be white and have the correct number of RJ45 keystone ports needed for cables run to receptacle.
- Owner will provide patch panel in IT Room 103
Significant Dates:
Posted: September 16, 2024
Deadline: September 20, 2024 (Late submissions are not considered)
Deadline: September 20, 2024 (Late submissions are not considered)
Project Information Contact:
Owner’s Representative: Erik Bailey
Email: ebailey@bluelakerancheria-nsn.gov